Trade lane intelligence
Data refreshed 23 Feb 2026Freight Rates Vietnam to India | FCL Shipping & Transit Times
Tracked container flow on this lane is currently about 7.5k TEU/mo. Typical transit is around 24.5 days. 12-week avg Vietnam -> India. India -> Vietnam is 20.6 days. Latest observed range: 15.6-27.5 days. Get live prices, schedules and documents.
Vietnam traffic
1.1M TEU/mo
12-week avg tracked country container traffic
Vietnam → India
39%
Share of tracked two-way lane volume
India → Vietnam
61%
Share of tracked two-way lane volume
Global container trade
24.6M TEU/mo
This lane is about 0.08% of tracked global volume
Trade Snapshot: Vietnam → India
Latest tracked refresh: 23 Feb 2026
Top shipping lines
Top shipping lines on Vietnam → India
Leading active lines seen on this lane, with reliability signals from sailing schedule data.
On-time performance
59%
Observed on this lane
Rollover risk
High
Current reliability outlook
Sailing frequency
Weekly (4d)
Typical service cadence
Country context
Origin and destination country snapshot
Country-level port activity and top partner-region mix from public location stats.
Vietnam
Popular pairs
58
Port pairs shown on this lane
Avg monthly traffic
1.1M TEU/mo
12-week avg tracked volume
Latest week
11.5k TEU/wk
23 Feb 2026
Top export regions
Top import regions
India
Popular pairs
58
Port pairs shown on this lane
Avg monthly traffic
2.1M TEU/mo
12-week avg tracked volume
Latest week
78k TEU/wk
23 Feb 2026
Top export regions
Top import regions
Top Commodities Traded (Vietnam → India)
From DGCI&S / analysis briefs & sector reports
Electrical & Electronic Equipment (HS-85)
Mobile phones, components, electronic goods. Growing rapidly with Vietnam's manufacturing expansion. US$4.2B (2024).
Machinery & Capital Goods (HS-84)
Industrial equipment, machinery parts, automation components. US$3.1B (2024).
Textiles & Apparel (HS-50-63)
Garments, fabrics, textile products. Vietnam is a major textile exporter. US$2.8B (2024).
Plastics & Rubber (HS-39-40)
Plastic products, rubber goods, packaging materials. US$1.9B (2024).
Major Ports & Transit Benchmarks
Benchmarks are indicative; use live schedules for ETAs
Origins (Vietnam):
Destinations (India):
Carriers:
| Port Pair | Service | Transit | Cut-off (typ.) | Free Days | |
|---|---|---|---|---|---|
| Hai Phong → Pipavav (Victor) Port | Weekly service | 15.6-27.5 days | VGM D-2 / CY D-1 | 14–21 | |
| Ho Chi Minh City → Cochin | Weekly service | 15.6-27.5 days | VGM D-2 / CY D-1 | 14–21 | |
| Ho Chi Minh City → Chennai | Weekly service | 15.6-27.5 days | VGM D-2 / CY D-1 | 14–21 | |
| Cat Lai → Chennai | Weekly service | 15.6-27.5 days | VGM D-2 / CY D-1 | 14–21 |
Instant Rate Levels
Spot all-in (Ocean+BAF) illustration; excludes local charges & taxes
Popular port pairs
Vietnam →India
Quick-launch searches we see most often on this lane.
Why Choose Cogoport for Vietnam → India?
Data-backed guidance • Transparent pricing • Reliable execution
Wide Carrier Coverage
Direct + T/S options across major services, balanced for time vs cost.
Transparent Rate Build-ups
See base, surcharges, and local charges before you book.
Compliance & Docs
AD Code, ICEGATE, COO, fumigation, license checks—built in.
Frequently Asked Questions
Related Blogs & Resources
Explore More Lanes & Services
Adjacent origin-destination pages you can open from this lane.

