Trade lane intelligence
Data refreshed 23 Feb 2026Freight Rates India to Singapore | FCL Shipping & Transit Times
Tracked container flow on this lane is currently about 2.7k TEU/mo. Typical transit is around 11.7 days. 12-week avg India -> Singapore. Singapore -> India is 11 days. Latest observed range: 10.4-14.9 days. Get live prices, schedules and documents.
India traffic
2.1M TEU/mo
12-week avg tracked country container traffic
India → Singapore
42%
Share of tracked two-way lane volume
Singapore → India
58%
Share of tracked two-way lane volume
Global container trade
24.6M TEU/mo
This lane is about 0.03% of tracked global volume
Trade Snapshot: India → Singapore
Latest tracked refresh: 23 Feb 2026
Top shipping lines
Top shipping lines on India → Singapore
Leading active lines seen on this lane, with reliability signals from sailing schedule data.
On-time performance
90%
Observed on this lane
Rollover risk
Low
Current reliability outlook
Sailing frequency
Monthly (45d)
Typical service cadence
Tracked history
12 mo
Consecutive months observed
Country context
Origin and destination country snapshot
Country-level port activity and top partner-region mix from public location stats.
India
Popular pairs
41
Port pairs shown on this lane
Avg monthly traffic
2.1M TEU/mo
12-week avg tracked volume
Latest week
78k TEU/wk
23 Feb 2026
Top export regions
Top import regions
Singapore
Popular pairs
41
Port pairs shown on this lane
Avg monthly traffic
4.7M TEU/mo
12-week avg tracked volume
Latest week
1.1M TEU/wk
16 Feb 2026
Top export regions
Top import regions
Top Commodities Traded (India → Singapore)
From DGCI&S / analysis briefs & sector reports
Electrical & Electronic Equipment (HS-85)
Smartphone components, PCBs, semiconductors, telecom gear.
Machinery & Capital Goods (HS-84)
CNC, pumps, bearings, industrial machinery & spares.
Chemicals incl. Organic (HS-29)
Intermediates for pharma & industrial use.
Major Ports & Transit Benchmarks
Benchmarks are indicative; use live schedules for ETAs
Origins (India):
Destinations (Singapore):
Carriers:
| Port Pair | Service | Transit | Cut-off (typ.) | Free Days | |
|---|---|---|---|---|---|
| Vizag → Singapore | Monthly service | 10.4-14.9 days | VGM D-2 / CY D-1 | 14–21 | |
| Ennore → Singapore | Monthly service | 10.4-14.9 days | VGM D-2 / CY D-1 | 14–21 | |
| JNPT (Nhava Sheva) → Singapore Container Terminal (SG) | Monthly service | 10.4-14.9 days | VGM D-2 / CY D-1 | 14–21 | |
| Kolkata → Jurong/Singapore (SG) | Monthly service | 10.4-14.9 days | VGM D-2 / CY D-1 | 14–21 |
Instant Rate Levels
Spot all-in (Ocean+BAF) illustration; excludes local charges & taxes
On click we'll redirect to Cogoport booking flow
Quick Compare
- Contract rates ↓ ~3–8% as tenor ↑.
- Each extra free day can ↑ all-in by ~USD 4–6.
- Peak windows: pre-CNY (Jan–Feb), back-to-school (Aug–Sep).
Popular port pairs
India →Singapore
Quick-launch searches we see most often on this lane.
Why Choose Cogoport for India → Singapore?
Data-backed guidance • Transparent pricing • Reliable execution
Wide Carrier Coverage
Direct + T/S options across major services, balanced for time vs cost.
Transparent Rate Build-ups
See base, surcharges, and local charges before you book.
Compliance & Docs
AD Code, ICEGATE, COO, fumigation, license checks—built in.
Frequently Asked Questions
Related Blogs & Resources
Explore More Lanes & Services
Adjacent origin-destination pages you can open from this lane.

