Trade lane intelligence
Data refreshed 23 Feb 2026Freight Rates India to Bangladesh | FCL Shipping & Transit Times
Tracked container flow on this lane is currently about 7.1k TEU/mo. Typical transit is around 21.1 days. 12-week avg India -> Bangladesh. Bangladesh -> India is 0 days. Latest observed range: 13.7-17.8 days. Get live prices, schedules and documents.
India traffic
2.1M TEU/mo
12-week avg tracked country container traffic
India → Bangladesh
82%
Share of tracked two-way lane volume
Bangladesh → India
18%
Share of tracked two-way lane volume
Global container trade
24.6M TEU/mo
This lane is about 0.04% of tracked global volume
Trade Snapshot: India → Bangladesh
Latest tracked refresh: 23 Feb 2026
Top shipping lines
Top shipping lines on India → Bangladesh
Leading active lines seen on this lane, with reliability signals from sailing schedule data.
Country context
Origin and destination country snapshot
Country-level port activity and top partner-region mix from public location stats.
India
Popular pairs
38
Port pairs shown on this lane
Avg monthly traffic
2.1M TEU/mo
12-week avg tracked volume
Latest week
78k TEU/wk
23 Feb 2026
Top export regions
Top import regions
Bangladesh
Popular pairs
38
Port pairs shown on this lane
Avg monthly traffic
180.4k TEU/mo
12-week avg tracked volume
Latest week
5.2k TEU/wk
23 Feb 2026
Top export regions
Top import regions
Top Commodities Traded (India → Bangladesh)
From DGCI&S / analysis briefs & sector reports
Electrical & Electronic Equipment (HS-85)
Smartphone components, PCBs, semiconductors, telecom gear.
Machinery & Capital Goods (HS-84)
CNC, pumps, bearings, industrial machinery & spares.
Chemicals incl. Organic (HS-29)
Intermediates for pharma & industrial use.
Major Ports & Transit Benchmarks
Benchmarks are indicative; use live schedules for ETAs
Origins (India):
Destinations (Bangladesh):
Carriers:
| Port Pair | Service | Transit | Cut-off (typ.) | Free Days | |
|---|---|---|---|---|---|
| JNPT (Nhava Sheva) → ICD Kamalapur/Dhaka | Direct / T/S | 13.7-17.8 days | VGM D-2 / CY D-1 | 14–21 | |
| Tuticorin → Chittagong | Direct | 13.7-17.8 days | VGM D-2 / CY D-1 | 14–21 | |
| Kattupalli → Chittagong | Rail / feeder | 13.7-17.8 days | Docs D-2 / CY D-1 | 7–14 | |
| Mundra → Mongla | Direct / T/S | 13.7-17.8 days | VGM D-2 / CY D-1 | 14–21 |
Instant Rate Levels
Spot all-in (Ocean+BAF) illustration; excludes local charges & taxes
On click we'll redirect to Cogoport booking flow
Quick Compare
- Contract rates ↓ ~3–8% as tenor ↑.
- Each extra free day can ↑ all-in by ~USD 4–6.
- Peak windows: pre-CNY (Jan–Feb), back-to-school (Aug–Sep).
Popular port pairs
India →Bangladesh
Quick-launch searches we see most often on this lane.
Why Choose Cogoport for India → Bangladesh?
Data-backed guidance • Transparent pricing • Reliable execution
Wide Carrier Coverage
Direct + T/S options across major services, balanced for time vs cost.
Transparent Rate Build-ups
See base, surcharges, and local charges before you book.
Compliance & Docs
AD Code, ICEGATE, COO, fumigation, license checks—built in.
Frequently Asked Questions
Related Blogs & Resources
Explore More Lanes & Services
Adjacent origin-destination pages you can open from this lane.

