Trade lane intelligence
Data refreshed 23 Feb 2026Freight Rates Japan to India | FCL Shipping & Transit Times
Tracked container flow on this lane is currently about 3.3k TEU/mo. Typical transit is around 30.5 days. 12-week avg Japan -> India. India -> Japan is 30.9 days. Latest observed range: 22.6-27.4 days. Get live prices, schedules and documents.
Japan traffic
624.9k TEU/mo
12-week avg tracked country container traffic
Japan → India
60%
Share of tracked two-way lane volume
India → Japan
40%
Share of tracked two-way lane volume
Global container trade
24.6M TEU/mo
This lane is about 0.02% of tracked global volume
Trade Snapshot: Japan → India
Latest tracked refresh: 23 Feb 2026
Top shipping lines
Top shipping lines on Japan → India
Leading active lines seen on this lane, with reliability signals from sailing schedule data.
Country context
Origin and destination country snapshot
Country-level port activity and top partner-region mix from public location stats.
Japan
Popular pairs
36
Port pairs shown on this lane
Avg monthly traffic
624.9k TEU/mo
12-week avg tracked volume
Latest week
4.5k TEU/wk
23 Feb 2026
Top export regions
Top import regions
India
Popular pairs
36
Port pairs shown on this lane
Avg monthly traffic
2.1M TEU/mo
12-week avg tracked volume
Latest week
78k TEU/wk
23 Feb 2026
Top export regions
Top import regions
Top Commodities Traded (Japan → India)
From DGCI&S / analysis briefs & sector reports
Electrical & Electronic Equipment (HS-85)
Smartphone components, PCBs, semiconductors, telecom gear.
Machinery & Capital Goods (HS-84)
CNC, pumps, bearings, industrial machinery & spares.
Chemicals incl. Organic (HS-29)
Intermediates for pharma & industrial use.
Major Ports & Transit Benchmarks
Benchmarks are indicative; use live schedules for ETAs
Origins (Japan):
Destinations (India):
Carriers:
| Port Pair | Service | Transit | Cut-off (typ.) | Free Days | |
|---|---|---|---|---|---|
| TOYAMA-SHINKO → Chennai | Direct / T/S | 22.6-27.4 days | VGM D-2 / CY D-1 | 14–21 | |
| Tokyo → Chennai | Transshipment | 22.6-27.4 days | VGM D-2 / CY D-1 | 14–21 | |
| Tokyo → Mumbai (ex Bombay) | Direct / T/S | 22.6-27.4 days | VGM D-2 / CY D-1 | 14–21 | |
| Nagoya → Chennai | Direct / T/S | 22.6-27.4 days | VGM D-2 / CY D-1 | 14–21 |
Instant Rate Levels
Spot all-in (Ocean+BAF) illustration; excludes local charges & taxes
On click we'll redirect to Cogoport booking flow
Quick Compare
- Contract rates ↓ ~3–8% as tenor ↑.
- Each extra free day can ↑ all-in by ~USD 4–6.
- Peak windows: pre-CNY (Jan–Feb), back-to-school (Aug–Sep).
Popular port pairs
Japan →India
Quick-launch searches we see most often on this lane.
Why Choose Cogoport for Japan → India?
Data-backed guidance • Transparent pricing • Reliable execution
Wide Carrier Coverage
Direct + T/S options across major services, balanced for time vs cost.
Transparent Rate Build-ups
See base, surcharges, and local charges before you book.
Compliance & Docs
AD Code, ICEGATE, COO, fumigation, license checks—built in.
Frequently Asked Questions
Related Blogs & Resources
Explore More Lanes & Services
Adjacent origin-destination pages you can open from this lane.

